Skip to the main content.
case study cover

Free Case Study

The Tank That Had to Stand Up

See how Bendel redesigned a 20,000-gallon ASME vacuum receiver from horizontal to vertical to meet tight space constraints at a university hypersonic wind tunnel research facility.

Download now to learn about:

  • Converting a horizontal vessel to a space-saving vertical configuration
  • Engineering a 20,000-gallon, full-vacuum stainless steel receiver
  • Using six external stiffening rings to withstand atmospheric pressure
  • Fabricating and testing a 21,000-pound ASME vessel
  • Coordinating storage and delivery around the university’s site-readiness schedule
  • Supporting critical vacuum infrastructure for hypersonic wind tunnel research